One Case That FTM Crusher Company Has Met
As a supplier of stone crusher plant, FTM Crusher Company has worked with many mining enterprises. Today, i select one to explain. To some degree, this case is the epitome of most mining plants. Most workshops of sand processing system are installed on the several steps in long and narrow valley.
Being limited by field, their foundations are made by derelicts. Since the working area is small, we can not construct workshops at the same time. In converse, we need to construct them in stages, from high to low. As consequence, the construction period is prolonged. What’s worse, enterprise owner does not thoroughly solve the land exploitation and makes the systemic construction more and more difficult.
At that time, there is only one country road toward working field. The road is narrow and has many sharp turns. These defects strictly impedes the delivering work of construction materials. For some devices requiring for whole-body transportation, they need to be dismantled and have parts delivered one by one.
While, some devices can not be dismantled. To deliver them, we need to wait under the road is officially exploited and used. To ensure the system construction be on time, we make the reasonable optimization on constructing plants and schedules. Since time and field are both limited, we adopt the ways of on-site making, remote making and on-site assembly together when making steel structure. The steel structure making is proceeded along with the foundation construction. So, we have some time saved.
See price list of stone crusher plant on website!